Products
Geva Sol bv
Netherlands
    ADRV0002A

    9929

    98

    147

    Contact supplier
    Favorites Like

    Description

    Catalogues

    Videos

    The connector puts full power on the coil until the solenoid has switched and then reduces it to the hold value.An LED indicates operation and in case of blinking: en error such as stuck plunger or broken coil occurred. At power down the current is discharged rapidly allowing for faster cycle times.
    The connector is polarized with and – supply. It is protected against accidental inversion.

    • ADRV0002A.pdf
      200 KB
    Other
    Log in
    New to GM industry Sign up
    By signing up,you agree to our terms of use, privacy policy,and cookie policy
    have an account? Log in